India Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008
India ASI: Labour Cost per Manday Worked: All Employees: Agriculture and Post Harvest Crop Activities
ASI: Labour Cost per Manday Worked: All Employees: Agriculture and Post Harvest Crop Activities data was reported at 381.810 INR in 2013. This records an increase from the previous number of 265.090 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Agriculture and Post Harvest Crop Activities data is updated yearly, averaging 265.090 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 381.810 INR in 2013 and a record low of 154.590 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Agriculture and Post Harvest Crop Activities data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
381.810 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Agriculture and Post Harvest Crop Activities from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Electric Power Generation, Transmission and Distribution
ASI: Labour Cost per Manday Worked: All Employees: Electric Power Generation, Transmission and Distribution data was reported at 1,026.170 INR in 2013. This records an increase from the previous number of 818.870 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Electric Power Generation, Transmission and Distribution data is updated yearly, averaging 695.160 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,026.170 INR in 2013 and a record low of 472.270 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Electric Power Generation, Transmission and Distribution data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,026.170 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Electric Power Generation, Transmission and Distribution from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Installation of Industrial Machinery and Equipment
ASI: Labour Cost per Manday Worked: All Employees: Installation of Industrial Machinery and Equipment data was reported at 1,038.270 INR in 2013. This records a decrease from the previous number of 1,127.800 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Installation of Industrial Machinery and Equipment data is updated yearly, averaging 832.800 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,127.800 INR in 2012 and a record low of 653.170 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Installation of Industrial Machinery and Equipment data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,038.270 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Installation of Industrial Machinery and Equipment from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacture of Gas, Distribution of Gaseous Fuels through Mains
ASI: Labour Cost per Manday Worked: All Employees: Manufacture of Gas, Distribution of Gaseous Fuels through Mains data was reported at 1,254.920 INR in 2013. This records an increase from the previous number of 1,105.930 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacture of Gas, Distribution of Gaseous Fuels through Mains data is updated yearly, averaging 1,063.380 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,254.920 INR in 2013 and a record low of 334.960 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacture of Gas, Distribution of Gaseous Fuels through Mains data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,254.920 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacture of Gas, Distribution of Gaseous Fuels through Mains from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Air and Spacecraft and Related Machinery
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Air and Spacecraft and Related Machinery data was reported at 1,086.420 INR in 2013. This records an increase from the previous number of 829.510 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Air and Spacecraft and Related Machinery data is updated yearly, averaging 807.130 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,086.420 INR in 2013 and a record low of 340.680 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Air and Spacecraft and Related Machinery data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,086.420 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Air and Spacecraft and Related Machinery from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Articles of Fur
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Articles of Fur data was reported at 398.870 INR in 2013. This records a decrease from the previous number of 437.630 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Articles of Fur data is updated yearly, averaging 423.700 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 542.480 INR in 2009 and a record low of 289.770 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Articles of Fur data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
398.870 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Articles of Fur from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Chemicals, Fertilizer and Nitrogen Compounds, Plastics and Synthetic Rubber in Primary Forms
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Chemicals, Fertilizer and Nitrogen Compounds, Plastics and Synthetic Rubber in Primary Forms data was reported at 1,167.720 INR in 2013. This records an increase from the previous number of 1,010.290 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Chemicals, Fertilizer and Nitrogen Compounds, Plastics and Synthetic Rubber in Primary Forms data is updated yearly, averaging 972.250 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,167.720 INR in 2013 and a record low of 537.500 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Chemicals, Fertilizer and Nitrogen Compounds, Plastics and Synthetic Rubber in Primary Forms data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,167.720 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Chemicals, Fertilizer and Nitrogen Compounds, Plastics and Synthetic Rubber in Primary Forms from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Iron and Steel
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Iron and Steel data was reported at 946.570 INR in 2013. This records an increase from the previous number of 766.330 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Iron and Steel data is updated yearly, averaging 737.870 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 946.570 INR in 2013 and a record low of 617.410 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Iron and Steel data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
946.570 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Iron and Steel from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Precious and Other Non Ferrous Metals
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Precious and Other Non Ferrous Metals data was reported at 1,137.960 INR in 2013. This records an increase from the previous number of 974.350 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Precious and Other Non Ferrous Metals data is updated yearly, averaging 834.310 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,137.960 INR in 2013 and a record low of 357.370 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Precious and Other Non Ferrous Metals data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,137.960 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Basic Precious and Other Non Ferrous Metals from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Batteries and Accumulators
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Batteries and Accumulators data was reported at 859.520 INR in 2013. This records an increase from the previous number of 734.990 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Batteries and Accumulators data is updated yearly, averaging 687.550 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 859.520 INR in 2013 and a record low of 567.150 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Batteries and Accumulators data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
859.520 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Batteries and Accumulators from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Beverages
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Beverages data was reported at 642.620 INR in 2013. This records an increase from the previous number of 545.580 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Beverages data is updated yearly, averaging 489.910 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 642.620 INR in 2013 and a record low of 420.100 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Beverages data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
642.620 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Beverages from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Bodies (Coach Work) for Motor Vehicles, Trailers and Semi Trailers
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Bodies (Coach Work) for Motor Vehicles, Trailers and Semi Trailers data was reported at 1,020.270 INR in 2013. This records an increase from the previous number of 762.790 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Bodies (Coach Work) for Motor Vehicles, Trailers and Semi Trailers data is updated yearly, averaging 762.790 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,020.270 INR in 2013 and a record low of 340.650 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Bodies (Coach Work) for Motor Vehicles, Trailers and Semi Trailers data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,020.270 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Bodies (Coach Work) for Motor Vehicles, Trailers and Semi Trailers from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Building of Ships and Boats
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Building of Ships and Boats data was reported at 843.760 INR in 2013. This records a decrease from the previous number of 858.890 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Building of Ships and Boats data is updated yearly, averaging 843.760 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 951.830 INR in 2011 and a record low of 687.000 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Building of Ships and Boats data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
843.760 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Building of Ships and Boats from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Casting of Metals
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Casting of Metals data was reported at 635.620 INR in 2013. This records an increase from the previous number of 547.970 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Casting of Metals data is updated yearly, averaging 496.930 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 635.620 INR in 2013 and a record low of 404.680 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Casting of Metals data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
635.620 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Casting of Metals from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Coke Oven Products
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Coke Oven Products data was reported at 1,073.330 INR in 2013. This records an increase from the previous number of 823.070 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Coke Oven Products data is updated yearly, averaging 654.370 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,073.330 INR in 2013 and a record low of 454.700 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Coke Oven Products data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,073.330 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Coke Oven Products from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Communication Equipment
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Communication Equipment data was reported at 1,417.180 INR in 2013. This records an increase from the previous number of 923.180 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Communication Equipment data is updated yearly, averaging 871.920 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,417.180 INR in 2013 and a record low of 577.950 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Communication Equipment data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,417.180 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Communication Equipment from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Computers and Peripheral Equipment
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Computers and Peripheral Equipment data was reported at 1,261.740 INR in 2013. This records an increase from the previous number of 1,191.990 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Computers and Peripheral Equipment data is updated yearly, averaging 914.410 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,261.740 INR in 2013 and a record low of 712.290 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Computers and Peripheral Equipment data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,261.740 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Computers and Peripheral Equipment from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Consumer Electronics
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Consumer Electronics data was reported at 1,731.840 INR in 2013. This records an increase from the previous number of 1,261.090 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Consumer Electronics data is updated yearly, averaging 1,261.090 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,731.840 INR in 2013 and a record low of 736.690 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Consumer Electronics data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,731.840 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Consumer Electronics from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Dairy Products
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Dairy Products data was reported at 710.590 INR in 2013. This records an increase from the previous number of 583.090 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Dairy Products data is updated yearly, averaging 583.090 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 710.590 INR in 2013 and a record low of 455.100 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Dairy Products data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
710.590 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Dairy Products from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Domestic Appliances
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Domestic Appliances data was reported at 1,029.700 INR in 2013. This records an increase from the previous number of 647.950 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Domestic Appliances data is updated yearly, averaging 623.990 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,029.700 INR in 2013 and a record low of 486.630 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Domestic Appliances data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,029.700 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Domestic Appliances from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electric Lighting Equipment
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electric Lighting Equipment data was reported at 618.660 INR in 2013. This records an increase from the previous number of 529.310 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electric Lighting Equipment data is updated yearly, averaging 456.900 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 618.660 INR in 2013 and a record low of 387.140 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electric Lighting Equipment data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
618.660 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electric Lighting Equipment from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electric Motors, Generators, Transformers and Electricity Distribution and Control Apparatus
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electric Motors, Generators, Transformers and Electricity Distribution and Control Apparatus data was reported at 1,228.860 INR in 2013. This records an increase from the previous number of 1,026.200 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electric Motors, Generators, Transformers and Electricity Distribution and Control Apparatus data is updated yearly, averaging 911.620 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,228.860 INR in 2013 and a record low of 664.820 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electric Motors, Generators, Transformers and Electricity Distribution and Control Apparatus data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,228.860 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electric Motors, Generators, Transformers and Electricity Distribution and Control Apparatus from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electronic Components
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electronic Components data was reported at 987.920 INR in 2013. This records an increase from the previous number of 907.900 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electronic Components data is updated yearly, averaging 647.260 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 987.920 INR in 2013 and a record low of 444.120 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electronic Components data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
987.920 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Electronic Components from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Footwear
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Footwear data was reported at 401.880 INR in 2013. This records an increase from the previous number of 360.030 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Footwear data is updated yearly, averaging 334.610 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 401.880 INR in 2013 and a record low of 236.820 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Footwear data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
401.880 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Footwear from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Furniture
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Furniture data was reported at 728.730 INR in 2013. This records an increase from the previous number of 638.940 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Furniture data is updated yearly, averaging 595.450 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 728.730 INR in 2013 and a record low of 500.320 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Furniture data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
728.730 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Furniture from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Games and Toys
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Games and Toys data was reported at 588.440 INR in 2013. This records an increase from the previous number of 545.430 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Games and Toys data is updated yearly, averaging 462.840 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 588.440 INR in 2013 and a record low of 297.380 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Games and Toys data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
588.440 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Games and Toys from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: General Purpose Machinery
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: General Purpose Machinery data was reported at 1,087.970 INR in 2013. This records an increase from the previous number of 942.590 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: General Purpose Machinery data is updated yearly, averaging 865.640 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,087.970 INR in 2013 and a record low of 649.780 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: General Purpose Machinery data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,087.970 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: General Purpose Machinery from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Glass and Glass Products
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Glass and Glass Products data was reported at 591.300 INR in 2013. This records an increase from the previous number of 508.800 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Glass and Glass Products data is updated yearly, averaging 468.820 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 591.300 INR in 2013 and a record low of 396.540 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Glass and Glass Products data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
591.300 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Glass and Glass Products from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Grain Mill Products, Starches and Starch Products
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Grain Mill Products, Starches and Starch Products data was reported at 359.100 INR in 2013. This records an increase from the previous number of 328.520 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Grain Mill Products, Starches and Starch Products data is updated yearly, averaging 264.910 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 359.100 INR in 2013 and a record low of 196.170 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Grain Mill Products, Starches and Starch Products data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
359.100 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Grain Mill Products, Starches and Starch Products from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Irradiation, Electro Medical and Electroherapeutic Equipment
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Irradiation, Electro Medical and Electroherapeutic Equipment data was reported at 2,719.820 INR in 2013. This records an increase from the previous number of 1,346.560 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Irradiation, Electro Medical and Electroherapeutic Equipment data is updated yearly, averaging 1,041.410 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 2,719.820 INR in 2013 and a record low of 543.970 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Irradiation, Electro Medical and Electroherapeutic Equipment data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
2,719.820 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Irradiation, Electro Medical and Electroherapeutic Equipment from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Jewellery, Bijouterie and Related Articles
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Jewellery, Bijouterie and Related Articles data was reported at 661.220 INR in 2013. This records an increase from the previous number of 584.410 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Jewellery, Bijouterie and Related Articles data is updated yearly, averaging 522.040 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 661.220 INR in 2013 and a record low of 437.660 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Jewellery, Bijouterie and Related Articles data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
661.220 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Jewellery, Bijouterie and Related Articles from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Knitted and Crocheted Apparel
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Knitted and Crocheted Apparel data was reported at 373.380 INR in 2013. This records an increase from the previous number of 319.340 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Knitted and Crocheted Apparel data is updated yearly, averaging 292.160 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 373.380 INR in 2013 and a record low of 229.960 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Knitted and Crocheted Apparel data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
373.380 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Knitted and Crocheted Apparel from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Magnetic and Optical Media
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Magnetic and Optical Media data was reported at 305.130 INR in 2013. This records a decrease from the previous number of 676.310 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Magnetic and Optical Media data is updated yearly, averaging 511.560 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 732.620 INR in 2009 and a record low of 305.130 INR in 2013. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Magnetic and Optical Media data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
305.130 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Magnetic and Optical Media from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Man Made Fibres
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Man Made Fibres data was reported at 972.410 INR in 2013. This records an increase from the previous number of 960.390 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Man Made Fibres data is updated yearly, averaging 882.670 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 972.410 INR in 2013 and a record low of 668.170 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Man Made Fibres data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
972.410 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Man Made Fibres from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Measuring, Testing, Navigating and Control Equipment, Watches and Clocks
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Measuring, Testing, Navigating and Control Equipment, Watches and Clocks data was reported at 1,276.010 INR in 2013. This records an increase from the previous number of 1,170.020 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Measuring, Testing, Navigating and Control Equipment, Watches and Clocks data is updated yearly, averaging 1,170.020 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,338.530 INR in 2011 and a record low of 207.460 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Measuring, Testing, Navigating and Control Equipment, Watches and Clocks data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,276.010 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Measuring, Testing, Navigating and Control Equipment, Watches and Clocks from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Medical and Dental Instruments and Supplies
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Medical and Dental Instruments and Supplies data was reported at 791.640 INR in 2013. This records an increase from the previous number of 652.560 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Medical and Dental Instruments and Supplies data is updated yearly, averaging 652.560 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 791.640 INR in 2013 and a record low of 503.050 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Medical and Dental Instruments and Supplies data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
791.640 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Medical and Dental Instruments and Supplies from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Motor Vehicles
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Motor Vehicles data was reported at 1,914.290 INR in 2013. This records an increase from the previous number of 1,503.390 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Motor Vehicles data is updated yearly, averaging 1,492.590 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,914.290 INR in 2013 and a record low of 859.010 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Motor Vehicles data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,914.290 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Motor Vehicles from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Musical Instruments
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Musical Instruments data was reported at 424.090 INR in 2013. This records a decrease from the previous number of 1,694.760 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Musical Instruments data is updated yearly, averaging 424.090 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,694.760 INR in 2012 and a record low of 272.360 INR in 2011. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Musical Instruments data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
424.090 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Musical Instruments from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Non Metallic Mineral Products, nec
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Non Metallic Mineral Products, nec data was reported at 544.350 INR in 2013. This records an increase from the previous number of 454.420 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Non Metallic Mineral Products, nec data is updated yearly, averaging 412.900 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 544.350 INR in 2013 and a record low of 339.930 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Non Metallic Mineral Products, nec data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
544.350 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Non Metallic Mineral Products, nec from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Optical Instruments and Equipment
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Optical Instruments and Equipment data was reported at 723.670 INR in 2013. This records a decrease from the previous number of 729.140 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Optical Instruments and Equipment data is updated yearly, averaging 686.690 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 729.140 INR in 2012 and a record low of 439.070 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Optical Instruments and Equipment data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
723.670 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Optical Instruments and Equipment from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Chemical Products
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Chemical Products data was reported at 714.100 INR in 2013. This records an increase from the previous number of 649.150 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Chemical Products data is updated yearly, averaging 563.900 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 714.100 INR in 2013 and a record low of 476.860 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Chemical Products data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
714.100 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Chemical Products from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Electrical Equipment
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Electrical Equipment data was reported at 704.220 INR in 2013. This records an increase from the previous number of 647.180 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Electrical Equipment data is updated yearly, averaging 590.150 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 704.220 INR in 2013 and a record low of 451.020 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Electrical Equipment data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
704.220 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Electrical Equipment from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Fabricated Metal Products, Metalworking Services or Activities
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Fabricated Metal Products, Metalworking Services or Activities data was reported at 569.850 INR in 2013. This records an increase from the previous number of 512.050 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Fabricated Metal Products, Metalworking Services or Activities data is updated yearly, averaging 484.250 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 569.850 INR in 2013 and a record low of 369.530 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Fabricated Metal Products, Metalworking Services or Activities data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
569.850 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Fabricated Metal Products, Metalworking Services or Activities from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Food Products
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Food Products data was reported at 512.260 INR in 2013. This records an increase from the previous number of 415.620 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Food Products data is updated yearly, averaging 354.680 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 512.260 INR in 2013 and a record low of 283.470 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Food Products data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
512.260 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Food Products from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Manufacturing, nec
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Manufacturing, nec data was reported at 499.820 INR in 2013. This records a decrease from the previous number of 503.690 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Manufacturing, nec data is updated yearly, averaging 435.750 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 503.690 INR in 2012 and a record low of 294.970 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Manufacturing, nec data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
499.820 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Manufacturing, nec from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Textiles
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Textiles data was reported at 442.050 INR in 2013. This records an increase from the previous number of 404.450 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Textiles data is updated yearly, averaging 346.240 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 442.050 INR in 2013 and a record low of 265.880 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Textiles data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
442.050 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Other Textiles from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Paper and Paper Products
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Paper and Paper Products data was reported at 609.850 INR in 2013. This records an increase from the previous number of 516.270 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Paper and Paper Products data is updated yearly, averaging 473.590 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 609.850 INR in 2013 and a record low of 350.900 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Paper and Paper Products data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
609.850 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Paper and Paper Products from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Pharmaceuticals, Medicinal Chemical and Botanical Products
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Pharmaceuticals, Medicinal Chemical and Botanical Products data was reported at 1,011.810 INR in 2013. This records an increase from the previous number of 931.230 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Pharmaceuticals, Medicinal Chemical and Botanical Products data is updated yearly, averaging 780.010 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,011.810 INR in 2013 and a record low of 627.400 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Pharmaceuticals, Medicinal Chemical and Botanical Products data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,011.810 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Pharmaceuticals, Medicinal Chemical and Botanical Products from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Plastic Products
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Plastic Products data was reported at 566.020 INR in 2013. This records an increase from the previous number of 475.310 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Plastic Products data is updated yearly, averaging 431.610 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 566.020 INR in 2013 and a record low of 326.030 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Plastic Products data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
566.020 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Plastic Products from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Prepared Animal Feeds
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Prepared Animal Feeds data was reported at 606.360 INR in 2013. This records an increase from the previous number of 480.100 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Prepared Animal Feeds data is updated yearly, averaging 448.030 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 606.360 INR in 2013 and a record low of 313.510 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Prepared Animal Feeds data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
606.360 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Prepared Animal Feeds from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Printing and Printing Service Activities
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Printing and Printing Service Activities data was reported at 822.110 INR in 2013. This records an increase from the previous number of 701.100 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Printing and Printing Service Activities data is updated yearly, averaging 641.900 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 822.110 INR in 2013 and a record low of 469.860 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Printing and Printing Service Activities data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
822.110 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Printing and Printing Service Activities from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Procesing and Preserving of Fruit and Vegetables
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Procesing and Preserving of Fruit and Vegetables data was reported at 526.200 INR in 2013. This records an increase from the previous number of 429.740 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Procesing and Preserving of Fruit and Vegetables data is updated yearly, averaging 396.200 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 526.200 INR in 2013 and a record low of 285.240 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Procesing and Preserving of Fruit and Vegetables data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
526.200 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Procesing and Preserving of Fruit and Vegetables from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Processing and Preserving of Fish, Crustaceans and Molluscs
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Processing and Preserving of Fish, Crustaceans and Molluscs data was reported at 449.540 INR in 2013. This records an increase from the previous number of 357.280 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Processing and Preserving of Fish, Crustaceans and Molluscs data is updated yearly, averaging 295.350 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 449.540 INR in 2013 and a record low of 207.870 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Processing and Preserving of Fish, Crustaceans and Molluscs data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
449.540 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Processing and Preserving of Fish, Crustaceans and Molluscs from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Processing and Preserving of Meat
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Processing and Preserving of Meat data was reported at 550.710 INR in 2013. This records an increase from the previous number of 455.840 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Processing and Preserving of Meat data is updated yearly, averaging 357.750 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 550.710 INR in 2013 and a record low of 339.840 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Processing and Preserving of Meat data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
550.710 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Processing and Preserving of Meat from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Products of Wood, Cork, Straw and Plaiting Materials
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Products of Wood, Cork, Straw and Plaiting Materials data was reported at 475.900 INR in 2013. This records an increase from the previous number of 386.790 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Products of Wood, Cork, Straw and Plaiting Materials data is updated yearly, averaging 338.770 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 475.900 INR in 2013 and a record low of 274.000 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Products of Wood, Cork, Straw and Plaiting Materials data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
475.900 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Products of Wood, Cork, Straw and Plaiting Materials from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Prts and Accessories for Motor Vehicles
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Prts and Accessories for Motor Vehicles data was reported at 806.450 INR in 2013. This records an increase from the previous number of 718.180 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Prts and Accessories for Motor Vehicles data is updated yearly, averaging 631.830 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 806.450 INR in 2013 and a record low of 519.660 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Prts and Accessories for Motor Vehicles data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
806.450 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Prts and Accessories for Motor Vehicles from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Railway Locomotives and Rolling Stock
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Railway Locomotives and Rolling Stock data was reported at 820.950 INR in 2013. This records an increase from the previous number of 713.370 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Railway Locomotives and Rolling Stock data is updated yearly, averaging 575.980 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 820.950 INR in 2013 and a record low of 489.340 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Railway Locomotives and Rolling Stock data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
820.950 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Railway Locomotives and Rolling Stock from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Refined Petroleum Products
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Refined Petroleum Products data was reported at 2,420.860 INR in 2013. This records an increase from the previous number of 2,305.080 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Refined Petroleum Products data is updated yearly, averaging 1,865.340 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 2,420.860 INR in 2013 and a record low of 561.730 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Refined Petroleum Products data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
2,420.860 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Refined Petroleum Products from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Reproduction of Recorded Media
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Reproduction of Recorded Media data was reported at 897.650 INR in 2013. This records an increase from the previous number of 849.310 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Reproduction of Recorded Media data is updated yearly, averaging 880.270 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,129.740 INR in 2010 and a record low of 514.370 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Reproduction of Recorded Media data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
897.650 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Reproduction of Recorded Media from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Rubber Products
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Rubber Products data was reported at 721.500 INR in 2013. This records an increase from the previous number of 617.340 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Rubber Products data is updated yearly, averaging 617.340 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 721.500 INR in 2013 and a record low of 333.180 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Rubber Products data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
721.500 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Rubber Products from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Saw Milling and Planing of Wood
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Saw Milling and Planing of Wood data was reported at 319.420 INR in 2013. This records an increase from the previous number of 253.040 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Saw Milling and Planing of Wood data is updated yearly, averaging 219.650 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 319.420 INR in 2013 and a record low of 163.340 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Saw Milling and Planing of Wood data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
319.420 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Saw Milling and Planing of Wood from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Special Purpose Machinery
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Special Purpose Machinery data was reported at 1,161.100 INR in 2013. This records an increase from the previous number of 1,026.400 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Special Purpose Machinery data is updated yearly, averaging 857.420 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,161.100 INR in 2013 and a record low of 722.070 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Special Purpose Machinery data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,161.100 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Special Purpose Machinery from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Spinning, Weaving and Finishing of Textile Fibres
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Spinning, Weaving and Finishing of Textile Fibres data was reported at 417.750 INR in 2013. This records an increase from the previous number of 367.570 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Spinning, Weaving and Finishing of Textile Fibres data is updated yearly, averaging 336.720 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 417.750 INR in 2013 and a record low of 262.580 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Spinning, Weaving and Finishing of Textile Fibres data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
417.750 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Spinning, Weaving and Finishing of Textile Fibres from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Sports Goods
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Sports Goods data was reported at 449.490 INR in 2013. This records an increase from the previous number of 356.240 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Sports Goods data is updated yearly, averaging 356.240 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 449.490 INR in 2013 and a record low of 288.240 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Sports Goods data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
449.490 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Sports Goods from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Structural Metal Products, Tanks, Reservoirs and Steam Generators
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Structural Metal Products, Tanks, Reservoirs and Steam Generators data was reported at 820.610 INR in 2013. This records an increase from the previous number of 725.960 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Structural Metal Products, Tanks, Reservoirs and Steam Generators data is updated yearly, averaging 548.820 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 820.610 INR in 2013 and a record low of 384.190 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Structural Metal Products, Tanks, Reservoirs and Steam Generators data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
820.610 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Structural Metal Products, Tanks, Reservoirs and Steam Generators from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Tanning and Dressing of Leather, Luggage, Handbags, saddlery and Harness, Dressing and Dyeing of Fur
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Tanning and Dressing of Leather, Luggage, Handbags, saddlery and Harness, Dressing and Dyeing of Fur data was reported at 407.080 INR in 2013. This records an increase from the previous number of 357.430 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Tanning and Dressing of Leather, Luggage, Handbags, saddlery and Harness, Dressing and Dyeing of Fur data is updated yearly, averaging 339.070 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 407.080 INR in 2013 and a record low of 296.620 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Tanning and Dressing of Leather, Luggage, Handbags, saddlery and Harness, Dressing and Dyeing of Fur data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
407.080 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Tanning and Dressing of Leather, Luggage, Handbags, saddlery and Harness, Dressing and Dyeing of Fur from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Tobacco Products
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Tobacco Products data was reported at 189.470 INR in 2013. This records an increase from the previous number of 170.050 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Tobacco Products data is updated yearly, averaging 157.090 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 189.470 INR in 2013 and a record low of 110.960 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Tobacco Products data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
189.470 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Tobacco Products from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Transport Equipment, nec
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Transport Equipment, nec data was reported at 796.430 INR in 2013. This records an increase from the previous number of 692.220 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Transport Equipment, nec data is updated yearly, averaging 650.170 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 796.430 INR in 2013 and a record low of 564.320 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Transport Equipment, nec data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
796.430 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Transport Equipment, nec from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Vegetable and Animal Oils and Fats
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Vegetable and Animal Oils and Fats data was reported at 481.660 INR in 2013. This records an increase from the previous number of 398.380 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Vegetable and Animal Oils and Fats data is updated yearly, averaging 359.420 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 481.660 INR in 2013 and a record low of 261.080 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Vegetable and Animal Oils and Fats data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
481.660 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Vegetable and Animal Oils and Fats from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Weapons and Ammunition
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Weapons and Ammunition data was reported at 737.740 INR in 2013. This records an increase from the previous number of 737.320 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Weapons and Ammunition data is updated yearly, averaging 452.750 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 737.740 INR in 2013 and a record low of 321.600 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Weapons and Ammunition data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
737.740 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Weapons and Ammunition from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Wearing Apparel, except Fur Apparel
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Wearing Apparel, except Fur Apparel data was reported at 444.070 INR in 2013. This records an increase from the previous number of 385.160 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Wearing Apparel, except Fur Apparel data is updated yearly, averaging 361.280 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 444.070 INR in 2013 and a record low of 290.190 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Wearing Apparel, except Fur Apparel data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
444.070 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Wearing Apparel, except Fur Apparel from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Wiring and Wiring devices
ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Wiring and Wiring devices data was reported at 676.260 INR in 2013. This records an increase from the previous number of 636.670 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Wiring and Wiring devices data is updated yearly, averaging 636.670 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 676.260 INR in 2013 and a record low of 488.440 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Wiring and Wiring devices data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
676.260 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Manufacturing: Wiring and Wiring devices from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Materials Recovery
ASI: Labour Cost per Manday Worked: All Employees: Materials Recovery data was reported at 462.540 INR in 2013. This records an increase from the previous number of 406.410 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Materials Recovery data is updated yearly, averaging 313.680 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 462.540 INR in 2013 and a record low of 265.040 INR in 2010. ASI: Labour Cost per Manday Worked: All Employees: Materials Recovery data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
462.540 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Materials Recovery from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Mining and Quarrying, nec
ASI: Labour Cost per Manday Worked: All Employees: Mining and Quarrying, nec data was reported at 312.660 INR in 2013. This records an increase from the previous number of 269.710 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Mining and Quarrying, nec data is updated yearly, averaging 258.060 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 312.660 INR in 2013 and a record low of 202.690 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Mining and Quarrying, nec data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
312.660 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Mining and Quarrying, nec from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Repair of Fabricated Metal Products, Machinery and Equipment
ASI: Labour Cost per Manday Worked: All Employees: Repair of Fabricated Metal Products, Machinery and Equipment data was reported at 1,353.800 INR in 2013. This records an increase from the previous number of 1,325.510 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Repair of Fabricated Metal Products, Machinery and Equipment data is updated yearly, averaging 811.420 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,353.800 INR in 2013 and a record low of 486.410 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Repair of Fabricated Metal Products, Machinery and Equipment data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,353.800 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Repair of Fabricated Metal Products, Machinery and Equipment from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Sewerage
ASI: Labour Cost per Manday Worked: All Employees: Sewerage data was reported at 555.660 INR in 2013. This records an increase from the previous number of 532.840 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Sewerage data is updated yearly, averaging 375.270 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 555.660 INR in 2013 and a record low of 291.500 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Sewerage data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
555.660 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Sewerage from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Steam and Air Conditions Supply
ASI: Labour Cost per Manday Worked: All Employees: Steam and Air Conditions Supply data was reported at 1,944.730 INR in 2013. This records an increase from the previous number of 476.490 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Steam and Air Conditions Supply data is updated yearly, averaging 517.260 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 1,944.730 INR in 2013 and a record low of 476.490 INR in 2012. ASI: Labour Cost per Manday Worked: All Employees: Steam and Air Conditions Supply data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
1,944.730 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Steam and Air Conditions Supply from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Waste Collection
ASI: Labour Cost per Manday Worked: All Employees: Waste Collection data was reported at 571.450 INR in 2013. This records an increase from the previous number of 431.300 INR for 2011. ASI: Labour Cost per Manday Worked: All Employees: Waste Collection data is updated yearly, averaging 452.230 INR from Mar 2009 (Median) to 2013, with 4 observations. The data reached an all-time high of 571.450 INR in 2013 and a record low of 281.470 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Waste Collection data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
571.450 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Waste Collection from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Waste Treatment and Disposal
ASI: Labour Cost per Manday Worked: All Employees: Waste Treatment and Disposal data was reported at 477.600 INR in 2013. This records an increase from the previous number of 438.000 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Waste Treatment and Disposal data is updated yearly, averaging 389.420 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 477.600 INR in 2013 and a record low of 329.030 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Waste Treatment and Disposal data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
477.600 2013 | yearly | 2009 - 2013 |
View India's India ASI: Labour Cost per Manday Worked: All Employees: Waste Treatment and Disposal from 2009 to 2013 in the chart:
India ASI: Labour Cost per Manday Worked: All Employees: Water Collection, Treatment and Supply
ASI: Labour Cost per Manday Worked: All Employees: Water Collection, Treatment and Supply data was reported at 562.950 INR in 2013. This records a decrease from the previous number of 667.280 INR for 2012. ASI: Labour Cost per Manday Worked: All Employees: Water Collection, Treatment and Supply data is updated yearly, averaging 562.950 INR from Mar 2009 (Median) to 2013, with 5 observations. The data reached an all-time high of 667.280 INR in 2012 and a record low of 263.590 INR in 2009. ASI: Labour Cost per Manday Worked: All Employees: Water Collection, Treatment and Supply data remains active status in CEIC and is reported by Labour Bureau Government of India. The data is categorized under India Premium Database’s Labour Market – Table IN.GBB044: Annual Survey of Industries: Labour Cost per Manday Worked: All Employees: by Industries: NIC 2008.
Last | Frequency | Range |
---|---|---|
562.950 2013 | yearly | 2009 - 2013 |