Indonesia Electricity: Installed Capacity: Gas Turbine
Installed Capacity: Gas Turbine Power Plant: Indonesia Power
Installed Capacity: Gas Turbine Power Plant: Indonesia Power data was reported at 794.360 MW in 2018. This records an increase from the previous number of 734.130 MW for 2017. Installed Capacity: Gas Turbine Power Plant: Indonesia Power data is updated yearly, averaging 846.360 MW from Dec 2000 (Median) to 2018, with 19 observations. The data reached an all-time high of 895.160 MW in 2010 and a record low of 544.000 MW in 2003. Installed Capacity: Gas Turbine Power Plant: Indonesia Power data remains active status in CEIC and is reported by State Electricity Company. The data is categorized under Indonesia Premium Database’s Energy Sector – Table ID.RBF005: Electricity: Installed Capacity: Gas Turbine.
Last | Frequency | Range |
---|---|---|
794.360 2018 | yearly | 2000 - 2018 |
View Indonesia's Installed Capacity: Gas Turbine Power Plant: Indonesia Power from 2000 to 2018 in the chart:
Indonesia Installed Capacity: Gas Turbine Power Plant: Kitlur Sumbagsel
Installed Capacity: Gas Turbine Power Plant: Kitlur Sumbagsel data was reported at 285.700 MW in 2018. This stayed constant from the previous number of 285.700 MW for 2017. Installed Capacity: Gas Turbine Power Plant: Kitlur Sumbagsel data is updated yearly, averaging 308.610 MW from Dec 2000 (Median) to 2018, with 19 observations. The data reached an all-time high of 526.000 MW in 2010 and a record low of 211.000 MW in 2004. Installed Capacity: Gas Turbine Power Plant: Kitlur Sumbagsel data remains active status in CEIC and is reported by State Electricity Company. The data is categorized under Indonesia Premium Database’s Energy Sector – Table ID.RBF005: Electricity: Installed Capacity: Gas Turbine.
Last | Frequency | Range |
---|---|---|
285.700 2018 | yearly | 2000 - 2018 |
View Indonesia's Indonesia Installed Capacity: Gas Turbine Power Plant: Kitlur Sumbagsel from 2000 to 2018 in the chart:
Indonesia Installed Capacity: Gas Turbine Power Plant: Kitlur Sumbagut
Installed Capacity: Gas Turbine Power Plant: Kitlur Sumbagut data was reported at 302.460 MW in 2018. This records a decrease from the previous number of 305.660 MW for 2017. Installed Capacity: Gas Turbine Power Plant: Kitlur Sumbagut data is updated yearly, averaging 233.500 MW from Dec 2000 (Median) to 2018, with 19 observations. The data reached an all-time high of 367.490 MW in 2012 and a record low of 166.000 MW in 2005. Installed Capacity: Gas Turbine Power Plant: Kitlur Sumbagut data remains active status in CEIC and is reported by State Electricity Company. The data is categorized under Indonesia Premium Database’s Energy Sector – Table ID.RBF005: Electricity: Installed Capacity: Gas Turbine.
Last | Frequency | Range |
---|---|---|
302.460 2018 | yearly | 2000 - 2018 |
View Indonesia's Indonesia Installed Capacity: Gas Turbine Power Plant: Kitlur Sumbagut from 2000 to 2018 in the chart:
Indonesia Installed Capacity: Gas Turbine Power Plant: PT PJB
Installed Capacity: Gas Turbine Power Plant: PT PJB data was reported at 1,191.400 MW in 2018. This records an increase from the previous number of 1,191.200 MW for 2017. Installed Capacity: Gas Turbine Power Plant: PT PJB data is updated yearly, averaging 360.000 MW from Dec 2000 (Median) to 2018, with 19 observations. The data reached an all-time high of 1,191.400 MW in 2018 and a record low of 80.000 MW in 2004. Installed Capacity: Gas Turbine Power Plant: PT PJB data remains active status in CEIC and is reported by State Electricity Company. The data is categorized under Indonesia Premium Database’s Energy Sector – Table ID.RBF005: Electricity: Installed Capacity: Gas Turbine.
Last | Frequency | Range |
---|---|---|
1,191.400 2018 | yearly | 2000 - 2018 |
View Indonesia's Indonesia Installed Capacity: Gas Turbine Power Plant: PT PJB from 2000 to 2018 in the chart:
Indonesia Installed Capacity: Gas Turbine Power Plant: Region V
Installed Capacity: Gas Turbine Power Plant: Region V data was reported at 34.000 MW in 2017. This stayed constant from the previous number of 34.000 MW for 2016. Installed Capacity: Gas Turbine Power Plant: Region V data is updated yearly, averaging 34.000 MW from Dec 2000 (Median) to 2017, with 18 observations. The data reached an all-time high of 38.000 MW in 2000 and a record low of 34.000 MW in 2017. Installed Capacity: Gas Turbine Power Plant: Region V data remains active status in CEIC and is reported by State Electricity Company. The data is categorized under Indonesia Premium Database’s Energy Sector – Table ID.RBF005: Electricity: Installed Capacity: Gas Turbine.
Last | Frequency | Range |
---|---|---|
34.000 2017 | yearly | 2000 - 2017 |
View Indonesia's Indonesia Installed Capacity: Gas Turbine Power Plant: Region V from 2000 to 2017 in the chart:
Indonesia Installed Capacity: Gas Turbine Power Plant: Total
Installed Capacity: Gas Turbine Power Plant: Total data was reported at 3,133.610 MW in 2018. This records an increase from the previous number of 3,075.830 MW for 2017. Installed Capacity: Gas Turbine Power Plant: Total data is updated yearly, averaging 2,570.590 MW from Dec 2000 (Median) to 2018, with 19 observations. The data reached an all-time high of 3,223.680 MW in 2010 and a record low of 1,207.000 MW in 2000. Installed Capacity: Gas Turbine Power Plant: Total data remains active status in CEIC and is reported by State Electricity Company. The data is categorized under Indonesia Premium Database’s Energy Sector – Table ID.RBF005: Electricity: Installed Capacity: Gas Turbine.
Last | Frequency | Range |
---|---|---|
3,133.610 2018 | yearly | 2000 - 2018 |
View Indonesia's Indonesia Installed Capacity: Gas Turbine Power Plant: Total from 2000 to 2018 in the chart:
Indonesia Installed Capacity: Gas Turbine Power Plant: UB Kalimantan
Installed Capacity: Gas Turbine Power Plant: UB Kalimantan data was reported at 201.110 MW in 2017. This records a decrease from the previous number of 219.400 MW for 2016. Installed Capacity: Gas Turbine Power Plant: UB Kalimantan data is updated yearly, averaging 48.000 MW from Dec 2000 (Median) to 2017, with 18 observations. The data reached an all-time high of 221.000 MW in 2015 and a record low of 21.000 MW in 2006. Installed Capacity: Gas Turbine Power Plant: UB Kalimantan data remains active status in CEIC and is reported by State Electricity Company. The data is categorized under Indonesia Premium Database’s Energy Sector – Table ID.RBF005: Electricity: Installed Capacity: Gas Turbine.
Last | Frequency | Range |
---|---|---|
201.110 2017 | yearly | 2000 - 2017 |
View Indonesia's Indonesia Installed Capacity: Gas Turbine Power Plant: UB Kalimantan from 2000 to 2017 in the chart:
Indonesia Installed Capacity: Gas Turbine Power Plant: UB Sulawesi South-South East-West
Installed Capacity: Gas Turbine Power Plant: UB Sulawesi South-South East-West data was reported at 192.330 MW in 2017. This records an increase from the previous number of 130.000 MW for 2016. Installed Capacity: Gas Turbine Power Plant: UB Sulawesi South-South East-West data is updated yearly, averaging 122.720 MW from Dec 2000 (Median) to 2017, with 18 observations. The data reached an all-time high of 192.330 MW in 2017 and a record low of 122.700 MW in 2009. Installed Capacity: Gas Turbine Power Plant: UB Sulawesi South-South East-West data remains active status in CEIC and is reported by State Electricity Company. The data is categorized under Indonesia Premium Database’s Energy Sector – Table ID.RBF005: Electricity: Installed Capacity: Gas Turbine.
Last | Frequency | Range |
---|---|---|
192.330 2017 | yearly | 2000 - 2017 |