印度 Electricity: Installed Capacity: Utilities: by States: Nuclear

印度 Electricity: Installed Capacity: Utilities: Nuclear

2008 - 2018 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear在2018-10达6,780.000 MW,相较于2018-09的6,780.000 MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear数据按月度更新,2008-01至2018-10期间平均值为4,780.000 MW,共130份观测结果。该数据的历史最高值出现于2018-10,达6,780.000 MW,而历史最低值则出现于2010-01,为4,120.000 MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB005: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
6,780.000 2018-10 月度 2008-01 - 2018-10

查看图表中 2008-01 到2018-10 期间的India 印度 Electricity: Installed Capacity: Utilities: Nuclear

India 印度 Electricity: Installed Capacity: Utilities: Nuclear

Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh在2024-09达127.270MW,相较于2024-08的127.270MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh数据按月度更新,2008-01至2024-09期间平均值为127.270MW,共201份观测结果。该数据的历史最高值出现于2015-01,达275.780MW,而历史最低值则出现于2009-08,为37.410MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
127.270 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh

India Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh

Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central在2024-09达127.270MW,相较于2024-08的127.270MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central数据按月度更新,2008-01至2024-09期间平均值为127.270MW,共201份观测结果。该数据的历史最高值出现于2015-01,达275.780MW,而历史最低值则出现于2009-08,为37.410MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
127.270 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central

印度 Electricity: Installed Capacity: Utilities: Nuclear: Central

2008 - 2018 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Central在2018-10达6,780.000 MW,相较于2018-09的6,780.000 MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Central数据按月度更新,2008-01至2018-10期间平均值为4,780.000 MW,共130份观测结果。该数据的历史最高值出现于2018-10,达6,780.000 MW,而历史最低值则出现于2010-01,为4,120.000 MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB005: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
6,780.000 2018-10 月度 2008-01 - 2018-10

查看图表中 2008-01 到2018-10 期间的India 印度 Electricity: Installed Capacity: Utilities: Nuclear: Central

India 印度 Electricity: Installed Capacity: Utilities: Nuclear: Central

Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh在2024-09达8.008MW,相较于2024-08的8.008MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh数据按月度更新,2008-01至2024-09期间平均值为8.010MW,共201份观测结果。该数据的历史最高值出现于2017-02,达8.840MW,而历史最低值则出现于2010-01,为4.840MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
8.008 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh

India Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh

Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central在2024-09达8.008MW,相较于2024-08的8.008MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central数据按月度更新,2008-01至2024-09期间平均值为8.010MW,共201份观测结果。该数据的历史最高值出现于2017-02,达8.840MW,而历史最低值则出现于2010-01,为4.840MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
8.008 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central

印度 Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh

2008 - 2018 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh在2018-10达48.000 MW,相较于2018-09的48.000 MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh数据按月度更新,2008-01至2018-10期间平均值为47.520 MW,共130份观测结果。该数据的历史最高值出现于2018-10,达48.000 MW,而历史最低值则出现于2009-08,为0.000 MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB005: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
48.000 2018-10 月度 2008-01 - 2018-10

查看图表中 2008-01 到2018-10 期间的India 印度 Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh

India 印度 Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh

印度 Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh: Central

2008 - 2018 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh: Central在2018-10达48.000 MW,相较于2018-09的48.000 MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh: Central数据按月度更新,2008-01至2018-10期间平均值为47.520 MW,共130份观测结果。该数据的历史最高值出现于2018-10,达48.000 MW,而历史最低值则出现于2009-08,为0.000 MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB005: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
48.000 2018-10 月度 2008-01 - 2018-10

查看图表中 2008-01 到2018-10 期间的India 印度 Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh: Central

India 印度 Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh: Central

Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli

2008 - 2023 | 月度 | MW | Central Electricity Authority

(DC)Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli在2023-09达12.890MW,相较于2023-08的12.890MW保持不变。(DC)Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli数据按月度更新,2008-01至2023-09期间平均值为8.460MW,共189份观测结果。该数据的历史最高值出现于2023-09,达12.890MW,而历史最低值则出现于2009-08,为1.980MW。CEIC提供的(DC)Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
12.890 2023-09 月度 2008-01 - 2023-09

查看图表中 2008-01 到2023-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli

India Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli

Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli and Daman and Diu

2023 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli and Daman and Diu在2024-09达29.220MW,相较于2024-08的29.220MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli and Daman and Diu数据按月度更新,2023-10至2024-09期间平均值为29.220MW,共12份观测结果。该数据的历史最高值出现于2024-09,达29.220MW,而历史最低值则出现于2024-02,为22.610MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli and Daman and Diu数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
29.220 2024-09 月度 2023-10 - 2024-09

查看图表中 2023-10 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli and Daman and Diu

India Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli and Daman and Diu

Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli and Daman and Diu: Central

2023 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli and Daman and Diu: Central在2024-09达29.220MW,相较于2024-08的29.220MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli and Daman and Diu: Central数据按月度更新,2023-10至2024-09期间平均值为29.220MW,共12份观测结果。该数据的历史最高值出现于2024-09,达29.220MW,而历史最低值则出现于2024-02,为22.610MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli and Daman and Diu: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
29.220 2024-09 月度 2023-10 - 2024-09

查看图表中 2023-10 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli and Daman and Diu: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli and Daman and Diu: Central

Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli: Central

2008 - 2023 | 月度 | MW | Central Electricity Authority

(DC)Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli: Central在2023-09达12.890MW,相较于2023-08的12.890MW保持不变。(DC)Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli: Central数据按月度更新,2008-01至2023-09期间平均值为8.460MW,共189份观测结果。该数据的历史最高值出现于2023-09,达12.890MW,而历史最低值则出现于2009-08,为1.980MW。CEIC提供的(DC)Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
12.890 2023-09 月度 2008-01 - 2023-09

查看图表中 2008-01 到2023-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli: Central

Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu

2008 - 2023 | 月度 | MW | Central Electricity Authority

(DC)Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu在2023-09达9.720MW,相较于2023-08的9.720MW保持不变。(DC)Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu数据按月度更新,2008-01至2023-09期间平均值为7.000MW,共189份观测结果。该数据的历史最高值出现于2023-09,达9.720MW,而历史最低值则出现于2009-08,为1.980MW。CEIC提供的(DC)Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
9.720 2023-09 月度 2008-01 - 2023-09

查看图表中 2008-01 到2023-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu

India Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu

Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu: Central

2008 - 2023 | 月度 | MW | Central Electricity Authority

(DC)Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu: Central在2023-09达9.720MW,相较于2023-08的9.720MW保持不变。(DC)Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu: Central数据按月度更新,2008-01至2023-09期间平均值为7.000MW,共189份观测结果。该数据的历史最高值出现于2023-09,达9.720MW,而历史最低值则出现于2009-08,为1.980MW。CEIC提供的(DC)Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
9.720 2023-09 月度 2008-01 - 2023-09

查看图表中 2008-01 到2023-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu: Central

Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi在2024-09达102.828MW,相较于2024-08的102.828MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi数据按月度更新,2008-01至2024-09期间平均值为102.830MW,共201份观测结果。该数据的历史最高值出现于2017-02,达122.080MW,而历史最低值则出现于2010-01,为47.080MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
102.828 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi

India Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi

Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi: Central在2024-09达102.828MW,相较于2024-08的102.828MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi: Central数据按月度更新,2008-01至2024-09期间平均值为102.830MW,共201份观测结果。该数据的历史最高值出现于2017-02,达122.080MW,而历史最低值则出现于2010-01,为47.080MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
102.828 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi: Central

India Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi: Central

Electricity: Installed Capacity: Utilities: Nuclear: Goa

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Goa在2024-09达41.680MW,相较于2024-08的41.680MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Goa数据按月度更新,2008-01至2024-09期间平均值为25.800MW,共201份观测结果。该数据的历史最高值出现于2024-09,达41.680MW,而历史最低值则出现于2009-08,为0.000MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Goa数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
41.680 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Goa

India Electricity: Installed Capacity: Utilities: Nuclear: Goa

Electricity: Installed Capacity: Utilities: Nuclear: Goa: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Goa: Central在2024-09达41.680MW,相较于2024-08的41.680MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Goa: Central数据按月度更新,2008-01至2024-09期间平均值为25.800MW,共201份观测结果。该数据的历史最高值出现于2024-09,达41.680MW,而历史最低值则出现于2009-08,为0.000MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Goa: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
41.680 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Goa: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Goa: Central

Electricity: Installed Capacity: Utilities: Nuclear: Gujarat

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Gujarat在2024-09达1,034.890MW,相较于2024-08的1,034.890MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Gujarat数据按月度更新,2008-01至2024-09期间平均值为559.320MW,共201份观测结果。该数据的历史最高值出现于2024-09,达1,034.890MW,而历史最低值则出现于2023-05,为559.000MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Gujarat数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
1,034.890 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Gujarat

India Electricity: Installed Capacity: Utilities: Nuclear: Gujarat

Electricity: Installed Capacity: Utilities: Nuclear: Gujarat: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Gujarat: Central在2024-09达1,034.890MW,相较于2024-08的1,034.890MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Gujarat: Central数据按月度更新,2008-01至2024-09期间平均值为559.320MW,共201份观测结果。该数据的历史最高值出现于2024-09,达1,034.890MW,而历史最低值则出现于2023-05,为559.000MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Gujarat: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
1,034.890 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Gujarat: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Gujarat: Central

Electricity: Installed Capacity: Utilities: Nuclear: Haryana

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Haryana在2024-09达100.936MW,相较于2024-08的100.936MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Haryana数据按月度更新,2008-01至2024-09期间平均值为100.940MW,共201份观测结果。该数据的历史最高值出现于2017-02,达109.160MW,而历史最低值则出现于2010-01,为76.160MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Haryana数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
100.936 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Haryana

India Electricity: Installed Capacity: Utilities: Nuclear: Haryana

Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central在2024-09达100.936MW,相较于2024-08的100.936MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central数据按月度更新,2008-01至2024-09期间平均值为100.940MW,共201份观测结果。该数据的历史最高值出现于2017-02,达109.160MW,而历史最低值则出现于2010-01,为76.160MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
100.936 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central

Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh在2024-09达28.952MW,相较于2024-08的28.952MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh数据按月度更新,2008-01至2024-09期间平均值为28.950MW,共201份观测结果。该数据的历史最高值出现于2017-02,达34.080MW,而历史最低值则出现于2010-01,为14.080MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
28.952 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh

India Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh

Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh: Central在2024-09达28.952MW,相较于2024-08的28.952MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh: Central数据按月度更新,2008-01至2024-09期间平均值为28.950MW,共201份观测结果。该数据的历史最高值出现于2017-02,达34.080MW,而历史最低值则出现于2010-01,为14.080MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
28.952 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh: Central

Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir在2024-09达67.980MW,相较于2024-08的67.980MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir数据按月度更新,2008-01至2024-09期间平均值为68.000MW,共201份观测结果。该数据的历史最高值出现于2017-02,达77.000MW,而历史最低值则出现于2024-09,为67.980MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
67.980 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir

India Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir

Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir: Central在2024-09达67.980MW,相较于2024-08的67.980MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir: Central数据按月度更新,2008-01至2024-09期间平均值为68.000MW,共201份观测结果。该数据的历史最高值出现于2017-02,达77.000MW,而历史最低值则出现于2024-09,为67.980MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
67.980 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir: Central

Electricity: Installed Capacity: Utilities: Nuclear: Karnataka

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Karnataka在2024-09达698.000MW,相较于2024-08的698.000MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Karnataka数据按月度更新,2008-01至2024-09期间平均值为475.860MW,共201份观测结果。该数据的历史最高值出现于2024-09,达698.000MW,而历史最低值则出现于2009-08,为190.900MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Karnataka数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
698.000 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Karnataka

India Electricity: Installed Capacity: Utilities: Nuclear: Karnataka

Electricity: Installed Capacity: Utilities: Nuclear: Karnataka: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Karnataka: Central在2024-09达698.000MW,相较于2024-08的698.000MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Karnataka: Central数据按月度更新,2008-01至2024-09期间平均值为475.860MW,共201份观测结果。该数据的历史最高值出现于2024-09,达698.000MW,而历史最低值则出现于2009-08,为190.900MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Karnataka: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
698.000 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Karnataka: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Karnataka: Central

Electricity: Installed Capacity: Utilities: Nuclear: Kerala

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Kerala在2024-09达362.000MW,相较于2024-08的362.000MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Kerala数据按月度更新,2008-01至2024-09期间平均值为228.600MW,共201份观测结果。该数据的历史最高值出现于2024-09,达362.000MW,而历史最低值则出现于2010-12,为78.100MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Kerala数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
362.000 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Kerala

India Electricity: Installed Capacity: Utilities: Nuclear: Kerala

Electricity: Installed Capacity: Utilities: Nuclear: Kerala: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Kerala: Central在2024-09达362.000MW,相较于2024-08的362.000MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Kerala: Central数据按月度更新,2008-01至2024-09期间平均值为228.600MW,共201份观测结果。该数据的历史最高值出现于2024-09,达362.000MW,而历史最低值则出现于2010-12,为78.100MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Kerala: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
362.000 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Kerala: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Kerala: Central

Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh在2024-09达491.980MW,相较于2024-08的491.980MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh数据按月度更新,2008-01至2024-09期间平均值为273.240MW,共201份观测结果。该数据的历史最高值出现于2024-09,达491.980MW,而历史最低值则出现于2009-08,为92.880MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
491.980 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh

India Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh

Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh: Central在2024-09达491.980MW,相较于2024-08的491.980MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh: Central数据按月度更新,2008-01至2024-09期间平均值为273.240MW,共201份观测结果。该数据的历史最高值出现于2024-09,达491.980MW,而历史最低值则出现于2009-08,为92.880MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
491.980 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh: Central

Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra在2024-09达1,068.660MW,相较于2024-08的1,068.660MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra数据按月度更新,2008-01至2024-09期间平均值为690.140MW,共201份观测结果。该数据的历史最高值出现于2024-09,达1,068.660MW,而历史最低值则出现于2023-05,为690.000MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
1,068.660 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra

India Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra

Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central在2024-09达1,068.660MW,相较于2024-08的1,068.660MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central数据按月度更新,2008-01至2024-09期间平均值为690.140MW,共201份观测结果。该数据的历史最高值出现于2024-09,达1,068.660MW,而历史最低值则出现于2023-05,为690.000MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
1,068.660 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central

Electricity: Installed Capacity: Utilities: Nuclear: Puducherry

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Puducherry在2024-09达86.000MW,相较于2024-08的86.000MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Puducherry数据按月度更新,2008-01至2024-09期间平均值为52.780MW,共201份观测结果。该数据的历史最高值出现于2024-09,达86.000MW,而历史最低值则出现于2010-12,为16.280MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Puducherry数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
86.000 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Puducherry

India Electricity: Installed Capacity: Utilities: Nuclear: Puducherry

Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central在2024-09达86.000MW,相较于2024-08的86.000MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central数据按月度更新,2008-01至2024-09期间平均值为52.780MW,共201份观测结果。该数据的历史最高值出现于2024-09,达86.000MW,而历史最低值则出现于2010-12,为16.280MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
86.000 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central

Electricity: Installed Capacity: Utilities: Nuclear: Punjab

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Punjab在2024-09达196.812MW,相较于2024-08的196.812MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Punjab数据按月度更新,2008-01至2024-09期间平均值为196.810MW,共201份观测结果。该数据的历史最高值出现于2017-02,达208.040MW,而历史最低值则出现于2010-01,为151.040MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Punjab数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
196.812 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Punjab

India Electricity: Installed Capacity: Utilities: Nuclear: Punjab

Electricity: Installed Capacity: Utilities: Nuclear: Punjab: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Punjab: Central在2024-09达196.812MW,相较于2024-08的196.812MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Punjab: Central数据按月度更新,2008-01至2024-09期间平均值为196.810MW,共201份观测结果。该数据的历史最高值出现于2017-02,达208.040MW,而历史最低值则出现于2010-01,为151.040MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Punjab: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
196.812 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Punjab: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Punjab: Central

Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan在2024-09达556.740MW,相较于2024-08的556.740MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan数据按月度更新,2008-01至2024-09期间平均值为556.740MW,共201份观测结果。该数据的历史最高值出现于2017-02,达573.000MW,而历史最低值则出现于2010-01,为469.000MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
556.740 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan

India Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan

Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan: Central在2024-09达556.740MW,相较于2024-08的556.740MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan: Central数据按月度更新,2008-01至2024-09期间平均值为556.740MW,共201份观测结果。该数据的历史最高值出现于2017-02,达573.000MW,而历史最低值则出现于2010-01,为469.000MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
556.740 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan: Central

Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu在2024-09达1,448.000MW,相较于2024-08的1,448.000MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu数据按月度更新,2008-01至2024-09期间平均值为986.500MW,共201份观测结果。该数据的历史最高值出现于2024-09,达1,448.000MW,而历史最低值则出现于2010-12,为478.500MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
1,448.000 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu

India Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu

Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central在2024-09达1,448.000MW,相较于2024-08的1,448.000MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central数据按月度更新,2008-01至2024-09期间平均值为986.500MW,共201份观测结果。该数据的历史最高值出现于2024-09,达1,448.000MW,而历史最低值则出现于2010-12,为478.500MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
1,448.000 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central

Electricity: Installed Capacity: Utilities: Nuclear: Telangana: Central

2015 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Telangana: Central在2024-09达148.730MW,相较于2024-08的148.730MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Telangana: Central数据按月度更新,2015-02至2024-09期间平均值为148.730MW,共116份观测结果。该数据的历史最高值出现于2024-09,达148.730MW,而历史最低值则出现于2017-02,为148.620MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Telangana: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
148.730 2024-09 月度 2015-02 - 2024-09

查看图表中 2015-02 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Telangana: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Telangana: Central

Electricity: Installed Capacity: Utilities: Nuclear: Telangana

2015 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Telangana在2024-09达148.730MW,相较于2024-08的148.730MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Telangana数据按月度更新,2015-02至2024-09期间平均值为148.730MW,共116份观测结果。该数据的历史最高值出现于2024-09,达148.730MW,而历史最低值则出现于2017-02,为148.620MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Telangana数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
148.730 2024-09 月度 2015-02 - 2024-09

查看图表中 2015-02 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Telangana

India Electricity: Installed Capacity: Utilities: Nuclear: Telangana

Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh在2024-09达289.476MW,相较于2024-08的289.476MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh数据按月度更新,2008-01至2024-09期间平均值为289.480MW,共201份观测结果。该数据的历史最高值出现于2017-02,达335.720MW,而历史最低值则出现于2010-01,为203.720MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
289.476 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh

India Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh

Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central在2024-09达289.476MW,相较于2024-08的289.476MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central数据按月度更新,2008-01至2024-09期间平均值为289.480MW,共201份观测结果。该数据的历史最高值出现于2017-02,达335.720MW,而历史最低值则出现于2010-01,为203.720MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
289.476 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central

Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand在2024-09达31.240MW,相较于2024-08的31.240MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand数据按月度更新,2008-01至2024-09期间平均值为22.280MW,共201份观测结果。该数据的历史最高值出现于2024-09,达31.240MW,而历史最低值则出现于2010-01,为16.280MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
31.240 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand

India Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand

Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central

2008 - 2024 | 月度 | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central在2024-09达31.240MW,相较于2024-08的31.240MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central数据按月度更新,2008-01至2024-09期间平均值为22.280MW,共201份观测结果。该数据的历史最高值出现于2024-09,达31.240MW,而历史最低值则出现于2010-01,为16.280MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB009: Electricity: Installed Capacity: Utilities: by States: Nuclear。

数值 频率 范围
31.240 2024-09 月度 2008-01 - 2024-09

查看图表中 2008-01 到2024-09 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central

India Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central
Electricity: Installed Capacity: Utilities: Nuclear
Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh
Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central
Electricity: Installed Capacity: Utilities: Nuclear: Central
Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh
Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central
Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh
Electricity: Installed Capacity: Utilities: Nuclear: Chhatisgharh: Central
Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli
Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli & Daman and Diu
Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli & Daman and Diu: Central
Electricity: Installed Capacity: Utilities: Nuclear: Dadra and Nagar Haveli: Central
Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu
Electricity: Installed Capacity: Utilities: Nuclear: Daman and Diu: Central
Electricity: Installed Capacity: Utilities: Nuclear: Delhi
Electricity: Installed Capacity: Utilities: Nuclear: Delhi: Central
Electricity: Installed Capacity: Utilities: Nuclear: Goa
Electricity: Installed Capacity: Utilities: Nuclear: Goa: Central
Electricity: Installed Capacity: Utilities: Nuclear: Gujarat
Electricity: Installed Capacity: Utilities: Nuclear: Gujarat: Central
Electricity: Installed Capacity: Utilities: Nuclear: Haryana
Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central
Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh
Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh: Central
Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir
Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir: Central
Electricity: Installed Capacity: Utilities: Nuclear: Karnataka
Electricity: Installed Capacity: Utilities: Nuclear: Karnataka: Central
Electricity: Installed Capacity: Utilities: Nuclear: Kerala
Electricity: Installed Capacity: Utilities: Nuclear: Kerala: Central
Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh
Electricity: Installed Capacity: Utilities: Nuclear: Madhya Pradesh: Central
Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra
Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central
Electricity: Installed Capacity: Utilities: Nuclear: Puducherry
Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central
Electricity: Installed Capacity: Utilities: Nuclear: Punjab
Electricity: Installed Capacity: Utilities: Nuclear: Punjab: Central
Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan
Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan: Central
Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu
Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central
Electricity: Installed Capacity: Utilities: Nuclear: Telagana: Central
Electricity: Installed Capacity: Utilities: Nuclear: Telangana
Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh
Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central
Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand
Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central
根据您的数据需求量身定制无限制访问
Flexible monthly access to CEIC data